ELECTRICAL – Utility Shutdown Notification

Electrical Shutdown Notification

Building & Zone: Kemper Hall (Eng II)/E157

Date & Time: **Thursday, July 25, 2013 – 6:00AM to 7:00PM**
Utility: Electrical (208/120V)
Power on the east side of the building will be off from 6:00am to
7:00am to transfer to generation then power will be off again
From 6:00pm to 7:00pm to return back to normal power.

Date & Time: **Friday, July 26, 2013 – 6:00AM to 7:00PM**
Utility: Electrical (480/277V)
Power on the east side of the building will be off from 6:00am to
7:00am to transfer to generation then power will be off again
From 6:00pm to 7:00pm to return back to normal power.

Purpose: To replace 208/120V transformer on 7/25 and to replace 480/277V transformer on 7/26. Generator will be placed on the south east side, at the front of the main lobby. Cables from the generator will run through the main lobby down the east stairwell and into the
electrical closet in the basement.

Additional: Requested by Joe Carbahel, Utilities High Voltage, cell 681-2241, Reference job 2411311-E157.

Processed by: Lorraine Mowery, Utility Shutdown Desk, Customer Support Center, ext. 752-1655, email: om-customers@ad3.ucdavis.edu